Sunday, March 1, 2020

A step forward in the poolhouse project

Finally we have some progresses in the poolhouse, for the missing steps that would declare this project concluded.
One of the parts that were partially done regards the metal sheet. Some protection around windows, doors and the terminal part of the downpipes.

The parts for the windows and doors became correct (I am sure plenty of people will stumble in the door stuff), in aluzink, so I will be able to paint them.
While, sadly the parts for the downpipes were wrong. I wanted again to have aluzink and we got them prepainted.
Window #1

Terminal part of the downpipe #1

Door #1

Downpipe #2 

Window #2

Last, door #2