![]() |
| The main entrance (as it was 2012) with the lamp lit |
Tuesday, September 3, 2024
Progresses for the pool house
Wednesday, March 22, 2023
Useful modernities
As we have this incredible controversial relationship with the wind, last year I tried to pragmatically buy a "Weather station" that could support, at least mentally, our handling of extreme weather situations.
I will never be tired to repeat that, as every project for us, things take its time and now, one month and one week later, we are finally able to have the "weather station" up and running, to enjoy being obsessed about temperature and m/s when the wind blows.
![]() |
| The main interface of the weather station: you can read indoor and outdoor temperature, how much it has been raining, what time is it, and how strong the wind is. It also predicts the coming weather |
It is of course something that does stick out a bit in the structure of the house. But I doubt i would have ever managed to find something "jugend" inspired ;-)
![]() |
| The wind sensor |
We also sacrificed the look of the balcony. Well, that balcony has nothing to do with the original balcony, really. Plus, since it has been probably built in some cheap/fast/unorthodox way, it does look like it would need a hand of paint, or two, or some love and care.
![]() |
| Rain sensor on our beautiful balcony |
Wednesday, April 7, 2021
Flying pool roof during Easter time
We have just had our Easter vacation which got concluded with a real crazy April weather. In Italy, that would be a crazy March weather.
Snow, hail, sun, snow, hail, wind. All at once, almost.
![]() |
| Snow for the day after Easter |
We managed during the few days off from work, where the weather was decent, do to some minor work with our projects to recover from the pool roof flying last year.
Mattias is keeping a decent tempo in repairing the different parts, so that the section that he was working is back on the pool.
![]() |
| One section is back on the pool |
![]() |
| Testing if it rolls fine |
![]() |
| Weeds all over the track |
But progresses, at least and at last.
Wednesday, March 31, 2021
A day of spring
![]() |
| The weeds (dandelions) where the pool roof piece had been |
Mattias is enjoying trying to renovate the pool roof after it flew last spring. The section that we moved today is under "polishing". He is cleaning it and I guess doing small adjustments.
![]() |
| Washing the pool roof section |
![]() |
| He made a reparation "table" so he can try to fix the pieces that broke |
The work with the pool roof has gone very slow. We were hoping the insurance company would pay for it, after talking with the people that sold and mounted the pool roof on the first place, but that was denied and we have been trying to seek also the possibility to get spare parts. I don't know how that operation is going.
![]() |
| Isn't it inviting? |
![]() |
| Blue anemone |
When it got a bit chilly, I went indoor. As always, it is not like there is a shortage of things to do and I took the occasion to look at my samsas where the two small cats have decided to have a party since they came and live with us.
![]() |
| The button is in a quite bad state and it is not fixed properly to the back of the couch |
Wednesday, August 19, 2020
Little fishes near the pool
I did think that just having a white ceiling could have been a bit blend in an already simple poolhouse. Not that it needs to become anything complex but I think having some decoration it would embellish it and make it more welcoming and particular.
I had a vision on how it was supposed to be, but it is always very hard to transmit what you have in your thought to someone else while also accomodating Mattias' wishes to have something water related theme.
After painting the whole ceiling with white linseed paint, we got a rim of little fishes painted with acrylic colors, catching on the shade of blue and brown of the mosaic tiles on the walls.
![]() |
| The tiles and the fishes goes in the same tones |
The fish motif is taken from a stencil which reminds of a mixture of jugend and art deco. Using a stencil on the ceiling was not a straightfoward operation and required a bit of turpentine to clean out the first trials.
![]() |
| A close up on the fishes |
![]() |
| A vintage look for some fishes |
Tuesday, July 14, 2020
Finishing and restarting
The days pass by too fast to have reached the feeling of completion when one of the eternal tasks we need to address are actually done, really done.
There are always a lot of leftovers and even if it is summer and we are here, things accumulated from last year are still waiting for us.
![]() |
| The escutcheon is back |
![]() |
| There, now I have started painting |
![]() |
| View from the ladder. I have got quite some nice bushes there |
![]() |
| One of the two chambers |
Wednesday, May 6, 2020
Another step forward for humankind
After the first attempt of getting the downpipe end correct, we finally got them right.
![]() |
| The downpipe is now gracefully ending with water towards the flowerbed. |
![]() |
| The other downpipe has the same |
![]() |
| As it generally looks, currently |
Friday, March 13, 2020
Our poolroof can fly!
![]() |
| Two sections of the pool have been dislocated by the wind and thrown over a hedge |
![]() |
| One of the profiles broke probably when flying over the hedge |
![]() |
| The wind was so strong that it broke the construction |
![]() |
| The two sections after moving them and securing them in a better position |
Sunday, March 1, 2020
A step forward in the poolhouse project
One of the parts that were partially done regards the metal sheet. Some protection around windows, doors and the terminal part of the downpipes.
The parts for the windows and doors became correct (I am sure plenty of people will stumble in the door stuff), in aluzink, so I will be able to paint them.
While, sadly the parts for the downpipes were wrong. I wanted again to have aluzink and we got them prepainted.
| Window #1 |
| Terminal part of the downpipe #1 |
![]() |
| Door #1 |
![]() |
| Downpipe #2 |
![]() |
| Window #2 |
![]() |
| Last, door #2 |
Sunday, August 25, 2019
Nice summer weekend
Anyway, thanks to this we have managed to (of course slowly) made some progresses in some of the billion of projects we have.
First. Mattias fixed properly the downpipe that collapsed.
However, the vine is still hoping for a better care.
![]() |
| The downpipe is back on its position |
![]() |
| The vine needs desperately some support |
![]() |
| Gladiolus |
![]() |
| Dahlia of two colors. |
![]() |
| There is where the clotheshorse should be! |
![]() |
| One layer more... |
Friday, August 9, 2019
Not a good week
Of course, I could also paint indoor some parts, but there are also other things I want to do...
We have been having the carpenter showing up, trying to adjust our garage doors, which unfortunately, as they are heavy, have a tendency to tilt slightly.
![]() |
| In a previous attempt, the carpenter had put some washer to tilt back the doors and it did help at the time. |
![]() |
| The metal bars are mounted on the doors |
![]() |
| The mismatch with the key buckler |
![]() |
| The garage doors. When looking at them one can see the uneven gaps due to the tilting |
![]() |
| Maybe seen from the other direction? |
![]() |
| I have almost picked up all the paint here |


















































