Monday, November 21, 2016

Bookshelf saga

From our empty wall we have made good progresses. But it has been a painful road.
Despite all, we are quite satisfied of the final result.

We start with June. When we finally got the first part of the bookshelf mounted. This implied few days of a carpenter home with us (almost literally) mounting the pieces together.

PIcture by Gunilla Carsten


Wood strips. Picture by Gunilla Carsten
Bottom is put together. Picture by Gunilla Carsten
For my side, everything look quite beautiful and melted in the room very nicely, as we would have hoped. 
However, (if we discard the fact that we were having a person  more around us all the time, more than we expected) there were some few things unclear. For example, although it was obviously not a problem for us, the bookshelf was not ready and I didn't understand it until that moment. Doors and shelves were still needing to be painted or finished or whatever so we would have visitors yet another time.
Sadly, the mounting of the shelf collided with also my handover at work - communicated all suddenly and so I couldn't really plan differently.
Result: I couldn't be home and so the last day, when the finishing paint was supposed to be done (or at least, that was part of the finishing touch)  I came home and  realized I had few questions about the job and especially the paint.... 
What's that grey stuff?
This was supposed to be the finishing paint
Almost not a single surface was free from shadows

Basically, our carpenter took the instructions from Ottosson linseed paint literally and didn't think of finishing the painting, rather stating that three layers were enough (and this was not clear from the form of contract we had). I did obviously expect a finished product, she was trying to climb on the windows (or on the bookshelf!) for stating she would not fix that.

Obviously, something went wrong in the drying process, otherwise that lovely effect wouldn't have been there. And that, me, an amateur in linseed painting, had understood clearly it couldn't look like that.
After a couple of weeks of discussions (not exactly friendly all the time) and plenty of stress, we managed to find an agreement. I would have to find someone else to fix the paint and of course, we would get the end of delivery done (with some extra time, just to be sure that the paint would be done properly).
Let's not talk of the chaos with boxes and books that had already got two months of dust and cat hair in the other room... I was not really keen to get some extra time on this at this point in time.
Key detail

The doors have been mounted. Picture by Gunilla Carsten
Since the painting needed to be redone, the shelves couldn't be put on. Picture by Gunilla Carsten.

In the end of August we finally got the shelves and the doors. 
The shelves did lie vertically on the wall next to the bookshelf for a few months more though. This because first we would have needed to paint, then to dry and then finally we could start to put everything in order.
Plenty of space to store a lot of stuff. Finally!
Painted better, right? :)

I was thinking that finally, with patience because we would have to wait some extra time to paint and dry, we could have this finally solved and out of our way. We could finally put all the books up, clean the room and enjoy this wonderful bookshelf.

But of course. I was optimist.

Few mounted shelves

Yes. I did manage with some hassle to put most of the shelves. Not exactly straightforward or easy. A bit unnecessarily complicated in a sense, since one has to push them down with a special move and hope they fit.
I was hoping for a bookshelf that should require some flexibility (yes, you never know I want to change how the shelves are depending on the books we put!) it wouldn't require a lot of cursing to move things around.

One of the nasty shelves didn't want to fit in at all

Obviously, not everything had been measured/tested properly (I bet the fault is that the shelves have been lying around instead of being mounted immediately) because there were few shelves that didn't fit the second block of the bookshelf. Few broke in this, we had to glue them (!) and at a certain point we gave up.


Will we ever finish this project?!?!?

Manga collection


Enough is enough and I was tired of waiting to clear the adjacent room from all our crap and I wanted to see books IN the bookshelf, finally!
So, with the help of Isabella, most of the shelves finaly got filled with books. And finaly, not only Mattias' books. Most of my stuff is here as well! My manga, my books, my university books, my notebooks....
There is still plenty that should come, one day, but I am pleased to see them "closed by" and have few things accessible for the kids.

Work is ongoing. Almost finished!

While putting up things in order, I have noticed another side issue... It seems it is obviously very hard to think that the doors height needs to match. Mattias thinks that this is a needed shrewdness because of our floor, which is not exactly flat.
I simply think it is something else that didn't go fine...
Hard to make doors?
We took control of the shelves - first we tried to grind them, but that didn't help so much. Then I begged my "master" for help (thank God we have this reference figure, although far away, among the constellation of carpenters which we deal with) and got the hint  to use a japanese saw.
And after buying that, Mattias enjoying finally refining these shelves. For some even 0.5 cm went off, which I think it is not an acceptable margin of error considering the type of work we have requested here.


Slicing up shelves
Anyway. We did it! Or better, Mattias did it! 
The shelves went up, the extra shelves have been put away. All the books are in order.
What satisfaction!
Finally, it is "done!"
But wait... isn't this too good to be true?
Of course it is!
We tried to unlock one of the doors and... *SBANG* the key broke. 
Mattias tried to unlock it with another key and... well, anyone can guess the result of this. 


Broken key :(
We are now trying to get hold of the keys from the German webshop, but answering to our request seems optional.
And of course, even with a key, it is almost impossible to lock that door again. Let's not comment on this...

Tuesday, November 8, 2016

Apples, apples and more apples (and plums...)

This year we have just had abundance of all sort of fruit. First it was black and red currants, with gooseberries.
They are all frozen and await to be cooked somehow.
They had to wait, because while we were at it, we were covered by plums - that got transformed in plum jam.

The first apples and the last plums
The fruit marathon had just started. Luckily, I couldn't find any trace of hazelnuts this year, or I would still be out picking up stuff..
All apple trees, even the ones that never get sunlight or are half dead, decided to produce a quite good quantity of apples. 
Starting in august, I picked up the last few days ago. All possible free time has just been used for picking up, storing apples and throw away all the bad ones.
Everytime an apple was falling I was afraid for my life


Storing them in the basement didn't work that good

The first load to Sövde musteri
As every year, we have picked up mainly with the goal to go to Sövde musteri to bring the apples and to buy, at a reduced price, the apple juice that they produce.
The oldest apple tree
Branches full of apples
After four trips, we have finally delivered everything possible (without counting that the first two boxes of apples has become apple cream) for the sum of 1127 kg. My estimate was of about 1200 kg, so I am pretty satisfied of my guess :) 


The receipts


A small sample of what we got

Now that this task is over it feels as all of a sudden I have got a lot of free time...
I am though hoping and counting on the fact that next year it will be a very bad apple year :)


Saturday, October 29, 2016

From autumn to spring

Just outside our kitchen entrance, for several years, it has just been autumn. 
Our railing just kept dropping leaf after leaf, especially during the worst storms. 

Overview over the railing
Rusty details
We have lost a couple of leaves, or around 30. We had though a small jar that had fallen as well.
It was time to take action!
So, of course, we are not blacksmiths as well, hence we hired one for the job (http://ferrumkonstsmide.se/).
First he came and remove the railing to bring it to his forge. 
Naked stairs

Then, he made something very temporary to avoid to have kids enjoying jumping or falling dangerously on the stairs to the basement.

The temporary basic substitute for a railing
Finally, at this forge, he did remove all the paint, started to attach the leaves we had and produced new ones and filled up all the holes where the rust had been eating the metal.

At the forge: the work has just started
He also removed the wooden details, sanded them and oil them. Sadly, there is some little work to be done with the wooden details. One piece is missing (!?), one is not screwed, one is not mounted properly and there is some hole that I think needs some minor fixing. I will check with my master carpenter what can be done here.
The missing piece of wood
It was then time to paint it and after a protective double layer of Isotrol, he applied some linseed oil.
Ready to be mounted 
Where wild roses grow...

And now, the roses are actually blooming properly :) So, no more falling leaves but red roses in bloom!


Just mounted restored railing. Pictures of Martin Hansson 

Eternal spring at Bellevue. Picture of Martin Hansson





Wednesday, October 12, 2016

Too many trees

One of the biggest issues we have is the garden maintenance. For how lovely it is, already when we moved in, there were billions of plants and trees scattered everywhere needing our attention.
During the past four years we have tried to take care of sum at least, and I think slowly one can see an improvement. Considering, still, that this is absolutely not the appearance we would like to have our garden, since going back to some more of "turn of the century" garden is our objective (for when we will finally retired, I guess).

This year I decided to put some effort in cutting down trees. Few of them (about 5) with the aim of having just a little stub leftover. For about 5-6 more, it was mostly about cutting them in height.
Now, if the first operation turned out quite ok, the second at the moment is possibly aesthetically speaking, awful.
I am THE lumberjack

As most of our beloved house projects, we had a good start. Everything was done in two days. Then, some adjustments to the logs took few days more. Then all the leftovers where put on the trailer for few weeks (!?!) until our neighbor, that wanted to borrow it, was kind enough to empty it (chances are that everything could still be there...).

Finally. The trunks need to be chomped in smaller pieces, that we will have somewhere (define somewhere) to dry (for few decades, I guess...) for then becoming firewood.
Post production, or better, cutting down trees.
Two months have passed and noone has come and fix it yet!!! How is it possible :)

At the same time, while the logs are beautifully resting for better days, we have hired an arborist to cut down one of the highest trees which sadly was not in a good state.
Let's say that the green areas are getting tidier ;)
That's the tree that won't be there anymore

Up on the top!


The tree was not very stable, so I guess one need even more to be careful here



The end result!




Shelves and hangers

Well, we have done few things in the spring and in the summer, but they are almost all half completed.
Among few projects, although very tiny, that finally saw completion we have two items: a coath-hanger and a shelf for the kitchen.

In our kitchen entrance, which is the entrance we use the most, we have had an hanger some time ago. Sadly, it fell miserably since it was not mounted properly on the wall and it was too heavy. The place is quite narrow, so fitting things is a bit hard, but we thought then to use the wall over the stairs to the basement which seems more sturdy than the first one.
The coat-hanger

With some luck, since the space is quite limited, I managed to buy something from the 40s that we thought it could be practical in that tiny area.
It is just on the stairs to the basement

While cleaning the attic (operation that has not yet been completed), we found an old plate rack. I wonder where does it come from.
The plate rack 

Anyway, it looked beautiful and after some adjustment, we manage to put it up for holding a dynamic collection of recipes books.
A nice detail

Saturday, May 28, 2016

Bellevue





For quite some time, if one wanted to address a letter or a postcard to somebody living in our house, they would have written "Name Surname, Bellevue, Åkarp".
Back then the houses were identified with a name, not with the street and a number.

I don't know why, but Axel Ingemansson baptised his house to Bellevue (french for beautiful view), maybe because it is a bit higher up than the rest of Åkarp and one could enjoy a nice view?
1909. Bellevue
Said this, for several decades the house name had been on the front facade, also the side facade had the name on it, but that was not from the start, from 1906. It came later, possibly around 1915.

Work is ongoing. The line has been filled in and now it is being putty
Having the house name on the facade has been one of my obsessions from almost the very beginning (I don't know why). And after got the opportunity to check the pictures from the first years of the house, we got the right font and we started the process for it.
The weather gods had been merciful to us, for once, during the work
Bellevue is now written back on the facade. Sadly, it was not an immediate thing to do (apart that we had a very talented painter who managed to get out from a picture the text and the proportions) because, possibly during the 60s, the upper windows got a decorative line in the plaster and that had to gone off again. The "filling up the line over the windows" operation turned out to be more painful than expected.

Work in progress. Picture of Maria Attström
What wonderful details!
 On top of that the scaffold had been mounted in a very peculiar way, so that Maria, our painter, could not reach the right top most corner. I improvised myself her pupil and I have probably messed up forever her work...
Putty on the plaster. The first painting attempt without it turned out to make the line too visible


It is freshly painted. Mmm. I am not very convinced of the result.
 Nevertheless, the result is amazing. The facade has gained so much with such a relatively small detail. I love to stare at it against the nice sky we can enjoy these days.

We just need to remove the scaffold

2016, Bellevue.

Bellevue, spring 2016. 


Saturday, May 14, 2016

It's "home"

Although, its home has been in Italy until two days ago, I am finally reunited with my (baby grand)piano after 14 years.
I can't describe how it feels - not that when I was studying/playing I would have thought it would have felt like this and not that I have ever played that incredibly well either.
But every day, for many years, I was glued to the chair (not very willingly) and now I wished I would have not stopped. Because now I can't play not even the pieces that I could consider "easier" to digest.
Its new home is in the tower room
The transportation was another piece of history. From a wrong "order" (in English one says baby grand piano and not generic piano specifying the length of the tail), to pure rain when the piano went out of the house.
Of course, it arrived the only day I was away (quite far off) for the whole time.
Essie Freeberg, with her grandmother and the pianist Jack Bagner
I wonder how many of the previous owners had put the piano there. We know that a grand piano was there during the 52-58 period (when the house was owned by Kathleen Cook Freeberg).

It survived transportation quite ok. Just some bumps on a side that hopefully will be fixed without too much problems.

Now, I just need a rehabilitation course...